Prep Specialists — Since 1998
Pressure washing, scraping, sanding, priming, and caulking done to specification. The difference between a paint job that fails in 3 years and one that lasts 10+.
Wood, metal, masonry, drywall, or specialty substrates — prep is matched to the coating system and the substrate.
Commercial-grade power washing for exterior siding, decks, concrete, and roofs. Mildew and chalk removal.
Hand-scrape loose and peeling paint. Machine-sand to feather edges and create proper adhesion profile.
Bonding primer, stain-blocking primer, bleed-blocker for knots. Matched to substrate and topcoat.
Polyurethane sealant at joints, gaps, and penetrations. Acrylic latex caulk at trim.
Nail holes, cracks, wood rot, and substrate damage. Matched fill for drywall, wood, and masonry.
Pre-1985 building? We test for lead paint and asbestos-containing textured ceilings before work begins.
Our Process
Every failed exterior paint job can be traced to a prep shortcut. Our process is slower than the competition — and it lasts twice as long.
Evaluate surface condition, moisture content, age, and hidden issues. Lead and asbestos test pre-1985.
Pressure wash exterior. Wet-wipe interior. Remove dirt, mildew, chalky oxidation, and grease.
Remove failed paint, feather edges, replace rotten wood, patch holes and cracks.
Spot-prime bare spots with matched primer. Re-caulk failed joints before topcoat.
Why All Painting Ltd.
Prep to SSPC standards where applicable (SP2 to SP10)
Substrate-matched primers — we don't rely on "universal" primer
Lead & asbestos testing on pre-1985 buildings
WorkSafeBC-compliant containment and dust control
Written warranty on the finished paint system
Prep crews across Greater Vancouver. We handle everything from heritage Kitsilano homes with 100 years of paint layers to new-build commercial concrete in Surrey.
Yes. 95% of exterior paint failures trace back to inadequate prep. Skipping prep saves days but costs you years of paint life.
Yes. For pre-1985 buildings we use XRF or swab testing. If lead is found, we follow WorkSafeBC lead-safe procedures: containment, HEPA, safe disposal.
We test before disturbing any pre-1990 textured ceiling. If asbestos is confirmed, we refer a licensed abatement contractor before painting work begins.
Substrate-matched primer selection, power washing with proper dwell time and rinse, caulk-gun control, and the patience to feather-sand 100 linear feet of trim edge instead of 10.
Exterior of a 2-storey home: 2–3 days of prep before the first coat of paint. Most of the work on a quality paint job is prep, not painting.
Full-service painting and coatings across Greater Vancouver since 1998.
Trusted by homeowners, strata councils, and commercial clients across Metro Vancouver.
Free, no-obligation estimate. We serve all of Greater Vancouver — from West Van to Maple Ridge.