Polyurea & Epoxy Specialists — Since 1998
Polyurea, polyaspartic, and epoxy garage floor coatings. Chemical-resistant, tire-proof, and decorative-flake finishes that transform a concrete slab into a showroom floor.
Every floor is different. We match system, thickness, and topcoat to how you'll use the space.
Premium 3-day installation. Base polyurea + decorative flake + polyaspartic topcoat. 15–20 year lifespan.
Classic epoxy base + decorative flake + UV-resistant topcoat. 10–15 year lifespan for a lower price point.
Plain colour with no flake. Good for storage-focused garages or lower-budget projects.
Marbled metallic pigments in a three-dimensional finish. High-end look for showcase garages.
Quartz-aggregate topcoat for high-slip-risk garages. Medical and commercial applications.
Concrete grinding or shot blasting, crack fill, pinhole sealer. Proper prep = 15-year lifespan.
Our Process
Every peeling garage coating traces back to poor prep. We diamond-grind or shot-blast every floor before any coating goes down.
Diamond-grind concrete to CSP 2–3 profile. Remove coatings, stains, and laitance. Vacuum clean.
Fill cracks with polyurea crack filler. Patch divots and pinholes. Level joints and control cuts.
Apply base coat (polyurea or epoxy). Broadcast decorative flake while wet until saturated.
Sand back excess flake. Apply UV-resistant polyaspartic or polyurethane topcoat. 24-hour walk-on.
Why All Painting Ltd.
Polyurea & polyaspartic expertise — fast-curing, long-lasting
Diamond-grinding prep — we don't acid-etch or skip prep
100+ flake colours — match your garage aesthetic
Written warranty — 5 to 15 years depending on system
Fully insured — $5M liability, WorkSafeBC
Garage floor coatings across Greater Vancouver. From single-car garages in East Van to multi-bay shops in Langley and Surrey, we match the system to your use case and budget.
Polyurea flake system: 15–20 years. Epoxy flake: 10–15 years. Solid epoxy: 5–10 years. Varies with traffic, hot tires, and chemical exposure.
Polyurea: 1–2 days with 24-hour walk-on and 72-hour drive-on. Epoxy: 3–5 days with 3-day walk-on and 7-day drive-on. Weather affects cure times.
Polyurea cures faster (hours vs days), is more flexible and UV-stable. Epoxy is less expensive and hides floor defects better. Both work well with proper prep.
Yes — quality polyurea and epoxy systems are tire-mark and hot-tire pickup resistant. Big-box store DIY kits typically are not.
Sometimes — depends on what's there and how well it's adhered. Usually better to grind it off and start fresh. We'll evaluate and tell you what's possible.
Full-service painting and coatings across Greater Vancouver since 1998.
Trusted by homeowners, strata councils, and commercial clients across Metro Vancouver.
Free, no-obligation estimate. We serve all of Greater Vancouver — from West Van to Maple Ridge.